- Goals
- Folder:GoalsGoal: Character as a Public ObjectUnit% of people surveyedCriterionBuildings are first and foremost meant to serve in favor of people. Architecture is a public object meaning that there is no free choice as to whether the public may or may not observe it. The architect does not create their own public so the design has to be appealing to the public at large. In order to measure ?character as a public object? criterion survey the general public by showing them the proposed design alternatives and asking which design they prefer.% of people surveyedBuildings are first and foremost meant to serve in favor of people. Architecture is a public object meaning that there is no free choice as to whether the public may or may not observe it. The architect does not create their own public so the design has to be appealing to the public at large. In order to measure ?character as a public object? criterion survey the general public by showing them the proposed design alternatives and asking which design they prefer.
- Folder:GoalsGoal: Continuity with the Decorative Arts and VernacularUnit# of shared attributes with surrounding buildingsCriterionEven the aesthetic in a work of architecture is simply to ?look right? in its context. Vernacular architecture tends to evolve over time to reflect the environmental, cultural, technological, and historical context in which it exists. To quantify his criteria compare its size and physical attributes to the size and physical attributes (material, mass, proportion, line, etc) of other buildings nearby. If the structure compares favorable to these, then the building should be evaluated positively.# of shared attributes with surrounding buildingsEven the aesthetic in a work of architecture is simply to ?look right? in its context. Vernacular architecture tends to evolve over time to reflect the environmental, cultural, technological, and historical context in which it exists. To quantify his criteria compare its size and physical attributes to the size and physical attributes (material, mass, proportion, line, etc) of other buildings nearby. If the structure compares favorable to these, then the building should be evaluated positively.
- Folder:GoalsGoal: Aesthetic HarmonyUnitscore 1-3 for each design element (7 elements means 21 potential points). 1 being poor execution of design elements, 2 being fair execution of design elements, and 3 being good execution of design element.CriterionSeven principles encompass an interesting design: balance, rhythm, emphasis, proportion and scale, movement, contrast, unity.score 1-3 for each design element (7 elements means 21 potential points). 1 being poor execution of design elements, 2 being fair execution of design elements, and 3 being good execution of design element.Seven principles encompass an interesting design: balance, rhythm, emphasis, proportion and scale, movement, contrast, unity.
- Folder:GoalsGoal: Increase CollaborationUnit# of open spacesCriterionOpen spaces encourage collaboration while closed spaces aren't as encouraging. Teamwork is a big part component of the re-design of the BC Annex.# of open spacesOpen spaces encourage collaboration while closed spaces aren't as encouraging. Teamwork is a big part component of the re-design of the BC Annex.
- Folder:GoalsGoal: Sustainable ConstructionUnit% of waste diverted from landfillsCriterion% of waste diverted from landfills
- Folder:GoalsGoal: Increase productivityUnit% of facade that is open glassCriterionIncrease productivity by providing more daylighting and views.% of facade that is open glassIncrease productivity by providing more daylighting and views.
- Folder:GoalsGoal: Optimize Energy PerformanceUnit1 to 19 points based on a % improvement from 8% (1 point) to 44% (19 points)CriterionDemonstrate a percentage improvement in the proposed building rating compared with the baseline building performance rating.1 to 19 points based on a % improvement from 8% (1 point) to 44% (19 points)Demonstrate a percentage improvement in the proposed building rating compared with the baseline building performance rating.
- Folder:GoalsGoal: Building ReuseUnit1 point for 55% to 74% building re-use, 2 points for 75%-94% building resuse and 3 points for 95%-100% building reuseCriterionConsider reusing, previously-occupied building structures, envelopes, and other elements to extend the lifecycle of existing building stock, conserve resources, reduce waste and environmental impacts of new buildings as they relate to materials manufacturing and transport.1 point for 55% to 74% building re-use, 2 points for 75%-94% building resuse and 3 points for 95%-100% building reuseConsider reusing, previously-occupied building structures, envelopes, and other elements to extend the lifecycle of existing building stock, conserve resources, reduce waste and environmental impacts of new buildings as they relate to materials manufacturing and transport.
- Folder:GoalsGoal: Use Materials with Recycled ContentUnitCriterionUse building materials that incorporate recycled content materials.Use building materials that incorporate recycled content materials.
- Folder:GoalsGoal: Make use of Regional MaterialsUnit10%, based on cost, of the total materials value. 10-19%=1 point, 20%+=2 pointsCriterionUse building materials and products that are extracted and manufactured within the region. Use building materials that have been harvested, recovered or extracted as well as manufactured within a specified distance of the project site.10%, based on cost, of the total materials value. 10-19%=1 point, 20%+=2 pointsUse building materials and products that are extracted and manufactured within the region. Use building materials that have been harvested, recovered or extracted as well as manufactured within a specified distance of the project site.
- Folder:GoalsGoal: Decrease WasteUnitpercentage of materials that are diverted from landfillsCriterionpercentage of materials that are diverted from landfills
- Folder:GoalsGoal: Reduce Water UseUnitWater Reduction compared to the baseline. 30-34% reduction = 2 points, 35-40% reduction = 3 points, 40%+ reduction = 4 pointsCriterionTo further increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.Water Reduction compared to the baseline. 30-34% reduction = 2 points, 35-40% reduction = 3 points, 40%+ reduction = 4 pointsTo further increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.
- Folder:GoalsGoal: Lowest Initial CostUnit$ per Sq. FtCriterionLowest initial cost of materials and building systems required for renovation.$ per Sq. FtLowest initial cost of materials and building systems required for renovation.
- Lowest Maintenance Costs Maintenance cost per year
- Greatest Energy Savings % of Saved energy