• Alternatives
    • [X]
      Alternative: Third Floor Addition Concept
      Additional information
      This concept is desired by BC Faculty, including three floors. First and second floors are reconfigured and refreshed spaces and the third floor is new constructed.
      Construction cost is: $2,600,000
      Third Floor Addition Concept
    • [X]
      Alternative: Third Floor Addition Concept + Flexible Spaces
      Additional information
      This concept includes a three floor building which the 1st and 2nd floor are reconfigured and refreshed spaces and the third one is new constructed.
      The main characteristic of this concept is its flexibility in 2nd and 3rd floor which enables us to reconfigure it by new function and access.
      Construction cost is: $2,600,000
      Third Floor Addition Concept + Flexible Spaces
    • [X]
      Alternative: Frontal Addition Concept
      Additional information
      This concept includes two floors which both of them are reconfigured and refreshed spaces.
      The main characteristic of this concept is the frontal addition to the building.
      Construction cost is: $2,600,000
      Frontal Addition Concept
    • [X]
      Alternative: Frontal Addition Concept + Third Floor Addition
      Additional information
      This concept includes a three floor building which the 1st and 2nd floor are reconfigured and refreshed spaces and the third one is new constructed.
      The main characteristics of this concept are its flexibility in 2nd and 3rd floor (which enables us to reconfigure it by new function and access) and the frontal addition.
      Construction cost is: $4,750,000
      Frontal Addition Concept + Third Floor Addition
  • Legend
    Objectives Select All Select All Leaf Objectives Unselect All
    • [X]
      Goal: Aesthetics
      Unit
      Criterion
      Project needs to satisfy aesthetic aspects
      Aesthetics
    • [X]
      Goal: Accommodate Growth in Building Construction Program
      Unit
      Criterion
      One of the main project target is provide space for new programs
      Accommodate Growth in Building Construction Program
    • [X]
      Goal: Quality
      Unit
      Criterion
      .Continuous Improvement
      .Consistency
      .Teamwork
      .Routine Measure and Analysis
      .Training
      Quality